  381.The construction company is fully in charge of the administration of all erection work.
  建设公司完全负责全部安装工程的行政管理。
  382.Our company cover all construction activities, that is : piling , civil engineering, mechanical erection, piping, electrical, instrumentation, painting and insulation work.
  我们公司涉及所有施工活动,包括:打桩、土建工程、机械安装、配管、电气、仪表、油漆和保温绝缘工作。
  383.What is the feature of this cracker (cracking furnace, heating furnace, reactor, mixer, centrifuger, belt-conveyer) ?
  这台裂解器(裂解炉、加热炉、反应器、搅拌器、离心机、皮带输送机)的特点是什么?
  384.The spherical tank (gas holder , container) will be shipped in the condition of edge prepared and bent plates.
  球罐(气柜、容器)将以板加工和弯板的条件发货。
  385.I think that the on-site training will be necessary for the tank.
  我想槽罐焊接工作的现场培训是必要的。
  386.The cooler (condenser, separator, boiler, generator, scrubber, stripper, heat exchanger )is a pressure vessel. It is subject to the pressure vessel code.
  这台冷却器是一个压力容器,它必须服从压力容器法规。(冷凝器、分离器、锅炉、发生器、洗涤器、汽提器、热交换器)
  387.The pressure vessel must be inspected by our authoritative organization-Administration of Labour.
  压力容器必须接受我们的权威机构劳动总局的监察。
  388.The new reciprocating (centrifugal, opposed-balanced) compressor will be installed next week.
  下周将安装这台新的往复式(离心式、对置平衡式)压缩机。
  389 The distilling column( absorber, column evaporator, regenerator, column washer) is a kind of equipment for outdoor installation.
  蒸馏塔(吸收塔、蒸发柱、再生塔、洗涤塔)是一种室外安装的设备。
  390.The TG70 steam turbine has a operation speed of 9600 rotations per minute( RPM)。
  TG70型蒸汽透平的运转速度为每分钟9600转。
  391.What do you think of this erection work?
  你看这项安装工作如何?
  392.This low (middle, high ) pressure blower (pump) will be assembled in the No.3 workshop.
  这台低(中、高)压鼓风机(泵)将在三号车间里予以装配。
  393.We are adjusting (installing, checking, aligning , leveling, purging )the equipment.
  我们正在调整(安装、检查、找正、找平、清洗)这台设备。
  394.The working team will finish the job next week.
  工作班组将在下周干完这活。
  395.We can adjust the levelness of the machine by means of shim and screw jack.
  我们可以利用垫铁和螺丝千斤顶来调整机器的水平度。
  396.After seven days , the grouted mortar will have concreted, then we shall tighten the anchor bolts.
  灌浆在七天以后凝固,我们就将拧紧地脚螺栓。
  397.The alignment of the coupling should be performed by two dial gauges.
  靠背轮的找正对准应用两只千分表来进行。
  398.The maximum allowable misalignment of the coupling is 0.02mm.
  靠背轮找正的最大允许偏差为0.02毫米。
  399.How many radial (axial ) clearnance are there in this bush (journal bearing , thrust bearing) ?
  这个轴套(轴颈轴承、止推轴承)的径向(轴向)间隙是多少?
  400.Does the bolt fit the nut?
  螺栓与螺母不配。